China EPS for Honda CRV wholesale supplier
- DECO
- TIANJIN CHINA
--- New electric power steering, can be installed to CRV without changing the current structure.
--- Electric parts are designed and produced by DECO.
--- Please check if the item part number is compatible before purchase. Or message us your VIN number.
--- Please contact us and we can customize the new models for you if you did not find the suitable one.
Fully New Pinion type electric power steering For Honda CR-V 2007 – 2011
Item specifications
Condition: | New | Surface Finish: | Polished, Rust Protected |
Brand: | Tianjin Deco | Country/Region of Manufacture: | China |
OE# | 53601-SWC -G02/53600SWCG04/53601-RZE-G02 | Manufacturer Part# | |
VIN # | 4st & 5th letter is ”RE” | Warranty | one year |
FEATURES:
The same installation dimension as OE parts.
100% BRAND NEW, highest quality available.
Engineered for superior durability, backed by industry leading warranty.
Note:
We only supply Mechanical Parts, Motor, Torque Sensor, Reducer without control module .The EPS controller of the CRV vehicle is integrated in the vehicle controller.
Note: We also have a solution for full or partially Autonomous applications. Please contact us with your requirements.
Fits
Year | Make | Model | Specific Details |
---|---|---|---|
2007 – 2011 | Honda | CR-V RE2.0 | VIN NO’s 4st & 5th letter is ”RE |
Part/Notes: Please match VIN number to ensure compatibility. There may be difference of VIN number between different countries. We recommend you to buy one sample to check before you place big order.
Not what you were looking for? Please contact with us. We also have a solution for full or partially Autonomous applications. Please contact us with your requirements.We can cooperate to develop new models for you.
COMMON SYMPTOMS of a failed Electric Power Steering
The stiff or hard steering is not only failing of Electric Power Steering. There are other dangerous fails but maybe you don't know. So, I give a list here.Once you meet any fails below,you need to change a replacement steering parts.
Vibrations
Power Steering Assist System failure warning on Driver Information Center.
A catch or bind going into or coming out of a turn in either direction.
Intermittent high pitched screeching noise similar to the sound of a motor being actuated.
Vehicle has a tendency to wander requiring the driver to make frequent and random and steering wheel corrections to either direction.
Shimmy;driver observes small or large,consistent,rotational oscillations of the steering wheel caused by various road surfaces or side-to-side(lateral)tire/wheel movements.
Poor return ability or sticky steering;the poor return of the steering wheel to center after a turn.
There's a difference in steering effort between turning right and left.
GOT QUESTIONS ABOUT THIS PART? Please contact us with email export@decotj.com
About Us
The professional solution providers of EPS for you.We can design customized products catering to various customers' requirement.
---Production facilities
---Research&Development
---Test and lab
--- Patents
We respect the value of the knowledge and gained more than 30 patensts. The amount is still growing. We have gotten CE certifacate and TS16949 Quality System Certification.
electric power steering package color or neutral carton package :
1 set per carton;
size of carton :43cm*42cm*16cm;
neutral white boxes and paper cartons.If you have legally registered brand, we can pack the goods in your branded boxes after getting your authorization letters
Any question in future, feel free to liaise with me at anytime.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.